Stomp Resins Ltd were asked to work alongside a specialist surveying company on a large project in Ireland.
The specification of the racking was changed, making it higher, which meant that the floor levels fell outside the tolerances for the fork lift trucks. As such we were required to grind areas that were high marked out and checked by the surveying company.
This is very important when using high lifting forklifts as too much difference in the floor levels could cause significant problems to them.
Using our three phase HTC RX8 grinder and vacuum, we ground the floor in the demarcated areas doing a steady controlled grind, before vacuuming the floor so it could be checked. Once checked continued to grind if required or moved on to the next area.
Project time 4 days – completed in 3.
Stomp Resin Ltd offer the “one stop shop” for all your flooring needs.